High cost green house may be a multispan structure. The cost estimates may vary considerably due to crop, cladding material and environmental control system.
| Sr.No. |
Item of work / Detail of material |
Requirement (Qty) |
| 1 |
G.I. Pipe of 25 mm. f for foundation |
50 x 1.20 =60m |
| 2 |
G.I. Pipe of 15 mm. f for arches and top M.S Flates 19x8m |
25 x 6 = 150m 25 x 1 = 25m |
| 3 |
For sides for holding mesh and UV film and front & backside &for purlins |
120.00m run |
| 4 |
M.S. ‘L’ angle19x19x3m for front and end frames and door |
28m run |
| 5 |
Plastic beading 25 mm width |
150 m |
| 6 |
UV stabilised film (200 micron) |
175 m2 |
| 7 |
Mesh 40-60 size all round (1.15m width) |
65 m |
| 8 |
Door frame and fitting |
L.S |
| 9 |
Hardware like Bolts and nuts, welding rods, Aluminium oxide, Painting etc. |
L.S |
| 10 |
Earth work and concreting of foundation with 1: 3: 6 |
L.S |
| 11 |
Labour cost |
L.S |